The Spirit of Tasmania passenger terminal in Devonport, Australia, forms part of a wider upgrade of the Spirit of Tasmania service between Tasmania and mainland Australia. The programme includes the introduction of the new Spirit of Tasmania IV and V vessels, together with a new passenger terminal and port infrastructure.

280
Mtons

For the construction of the new passenger terminal, Heavy Duty Triangle Plates No. 120 (HDTP) were used in a 280-tonne lifting operation. The HDTP provided the central connection point within the lifting system, distributing the lifting forces across multiple sling assemblies.

280-tonne ligtinf operation
​
Photos courteousy of Wire Rope Services
​
Project overview

used products

Spelter Sockets

Heavy Duty Triangle Plates (HDTP)

​
​

Would you like more information about this project?

Uta Heermeyer
Inside Sales | Export & Logistics
​
Contact our specialists
Other projects
OEM diaphragm wall grab equipment
Equipment manufacturers & Owners
OEM diaphragm wall grab equipment

Our specialized Tiefbau Wedge Sockets (TWS) provide high-fatigue hoisting rope terminations for Sennebogen diaphragm wall grab equipment operating under heavy cyclic loads.

Salvage of Costa Concordia
Maritime
Salvage of Costa Concordia

After a tragic accident, the Costa Concordia ran aground and lay partially submerged off the coast in Italy for over 18 months. In one of the largest salvage operations in history, which took around 19 hours, the ship was turned upright.

Modified AqualLine sockets support wind turbine hub installation
Energy & utilities
Modified AqualLine sockets support wind turbine hub installation

Our modified AqualLine sockets provided tailored wire rope terminations within a Hub Rotating Tool, ensuring stable handling and precise alignment during complex wind turbine hub installations.

​
​