Modified AqualLine sockets support wind turbine hub installation
Energy & utilities
Energy & utilities

Modified AqualLine sockets support wind turbine hub installation

During the installation of a wind turbine hub and rotor, intermediate stages occur where the hub is not yet balanced due to incomplete blade installation.

280
Mtons

A Hub Rotating Tool is used as an installation aid to control both positioning and rotation of the hub during installation and blade mounting. The tool enables operators to adjust the hub orientation in a controlled manner, ensuring correct alignment for subsequent blade installation.

Equipped with three lifting points, the system allows stable handling throughout lifting and rotation operations.

Modified AqualLine Open Spelter Sockets were used as terminations on the wire rope slings within the Hub Rotating Tool. The wire inlet geometry was adapted to match the specified rope diameter, ensuring proper integration within the lifting assembly.

Read more about our custom solutions

​
Photos courtesy of TILLEN b.v.
​
Project overview

used products

Spelter Sockets

Open Spelter Sockets (OSS)

​
​

Would you like more information about this project?

Raju Schnettberg
Management | Business Development | Sales
​
Contact our specialists
Other projects
Delivering the world’s largest Fast Connector Sockets for the Pioneering Spirit
Offshore
Delivering the world’s largest Fast Connector Sockets for the Pioneering Spirit

The Pioneering Spirit is one of the largest offshore construction vessels in the world, designed entirely in-house by the Allseas Group. A record-breaking vessel that can install and remove large oil and gas platforms in a single lift, and is able to install extremely heavy pipelines. The idea for the vessel was born several decades ago and after years of engineering and construction, the vessel entered service in 2016.

Military vehicle recovery
Defence & Field Operations
Military vehicle recovery

For various projects in this sector, our Closed Spelter Sockets were used in towing, heavy-lifting and vehicle recovery operations.

Renovation of the Angus L. Macdonald bridge
Civil construction
Renovation of the Angus L. Macdonald bridge

We supplied high-strength AqualLine Open Spelter Sockets for the suspension rope replacement during the major upgrade of Canada's historic Angus L. Macdonald bridge.

​
​