Open Strand Spelter Sockets for open pit mining shovels
Mining
Mining

Open Strand Spelter Sockets for open pit mining shovels

Open pit mining shovels are used in surface mining operations to excavate and load large volumes of material. As part of this process, they are subjected to high dynamic loads and continuous operating cycles, placing significant demands on the wire rope assemblies used in the hoist and crowd systems. These systems control the lifting, lowering, and digging movements of the shovel and play a key role in the excavation process.

280
Mtons

For various surface mining projects, we supply our Open Strand Spelter Sockets No. 470 for wire rope assemblies used on open pit mining shovels. Manufactured from cast steel and designed for stranded wire ropes, the Open Strand Spelter Socket provides an efficient termination method for wire rope assemblies subjected to high operating loads.

​
Illustrative image of an open pit mining shovel – Photo courtesy of Foley Inc – CAT
​
Project overview

used products

Spelter Sockets

Open Strand Spelter Sockets (OSSS)

​
​

Would you like more information about this project?

Raju Schnettberg
Management | Business Development | Sales
​
Contact our specialists
Other projects
Biglift Happy Star
Maritime
Biglift Happy Star

Officially in service since 2014, the Happy Star is one of BigLift’s heavy lifting vessels. It features two 900-metre mast cranes and has a lifting capacity of 2200 mt.

Renovation of the Angus L. Macdonald bridge
Civil construction
Renovation of the Angus L. Macdonald bridge

We supplied high-strength AqualLine Open Spelter Sockets for the suspension rope replacement during the major upgrade of Canada's historic Angus L. Macdonald bridge.

Modified AqualLine sockets support wind turbine hub installation
Energy & utilities
Modified AqualLine sockets support wind turbine hub installation

Our modified AqualLine sockets provided tailored wire rope terminations within a Hub Rotating Tool, ensuring stable handling and precise alignment during complex wind turbine hub installations.

​
​