Learn more

Open Spelter Sockets for industrial overhead cranes
Heavy Industry & industrial manufacturing
Heavy Industry & industrial manufacturing

Open Spelter Sockets for industrial overhead cranes

Open Spelter Sockets No. 104 were supplied for use in an overhead crane operating in a manufacturing facility. The sockets serve as wire rope terminations within the crane's lifting system, enabling loads to be transferred between the wire rope assembly and the hook block during lifting operations.

Designed for repetitive lifting cycles and continuous operation, the crane is used for the handling of materials and components within the production environment.

280
Mtons
​
Project overview

used products

Spelter Sockets

Open Spelter Sockets (OSS)

​
​

Would you like more information about this project?

Uta Heermeyer
Inside Sales | Export & Logistics
​
Contact our specialists
Other projects
Salvage of Costa Concordia
Maritime
Salvage of Costa Concordia

After a tragic accident, the Costa Concordia ran aground and lay partially submerged off the coast in Italy for over 18 months. In one of the largest salvage operations in history, which took around 19 hours, the ship was turned upright.

World’s longest pedestrian suspension bridge
Civil construction
World’s longest pedestrian suspension bridge

World’s longest pedestrian suspension bridge opened on 13 May 2022 in the ski resort of Dolni Morava in the Czech Republic. The footbridge spans a distance of 721 meters and took around two years to construct. Due to its length, this narrow suspension bridge is equipped with special wind cables and a wind-resistant stability system.

280-tonne lifting operation at the Spirit of Tasmania passenger terminal
Civil construction
280-tonne lifting operation at the Spirit of Tasmania passenger terminal

Our Heavy Duty Triangle Plates No. 120 served as the central connection point to safely distribute forces during a critical 280-tonne lift for the new passenger terminal.

​
​