Learn more

Custom solution for dredger spud system 
Dredging
Dredging

Custom solution for dredger spud system

For this dredging project, we supplied a custom SSH (Sling Socket Hoist) as an alternative to more conventional connection methods used in spud sling assemblies. The SSH is integrated into a dredger spud sling assembly within the vessel’s spud system. They are a key part of the system that keeps the vessel anchored and stable during dredging operations.  

280
Mtons
Custom solutions

In this system, spud slings are used to lift and lower the spuds — vertical steel piles that anchor the dredger to the seabed — enabling stable positioning during operations such as reclamation, trenching, and port deepening.  

By reducing the number of separate components and providing a compact, system-ready connection, the SSH offers an efficient solution where standard products do not fit the operational or installation requirements. 

Read more about our custom solutions

​
Courtesy of Bhatia Brothers
​
Project overview

Would you like more information about this project?

Barry van Wijk
Engineering | Quality Control & Assurance
​
Contact our specialists
Other projects
Tensile Roof Structure at the Singapore National Stadium
Civil construction
Tensile Roof Structure at the Singapore National Stadium

The national stadium of Singapore, which opened in 2014, has a capacity of 55,000 seats. Its iconic roof measures 312-meters across and claims to be the largest free-spanning dome in the world.

World’s longest pedestrian suspension bridge
Civil construction
World’s longest pedestrian suspension bridge

World’s longest pedestrian suspension bridge opened on 13 May 2022 in the ski resort of Dolni Morava in the Czech Republic. The footbridge spans a distance of 721 meters and took around two years to construct. Due to its length, this narrow suspension bridge is equipped with special wind cables and a wind-resistant stability system.

Open Spelter Sockets for industrial overhead cranes
Heavy Industry & industrial manufacturing
Open Spelter Sockets for industrial overhead cranes

Our Open Spelter Sockets No. 104 provide dependable wire rope terminations for industrial overhead cranes handling repetitive lifting cycles in production environments.

​
​